Everything You Need to Know about the F-35C

Variants for different customers or mission profiles
Elite 5K
Elite 5K
 
Posts: 9792
Joined: 19 Dec 2005, 04:14

by Corsair1963 » 15 Sep 2020, 05:37

gc wrote:16 F-35C for the future Carrier Air Wing. Less Rhinos featured.

https://seapowermagazine.org/navys-futu ... nto-focus/


Sounds like the USN is pushing the first of F-35C Squadrons to 16 instead of 10. Until every Air Wing acquires at least a single Squadron. I assume that number will drop back to 10 -12 aircraft. When they add a second squadron to each Air Wing post 2030.


Elite 5K
Elite 5K
 
Posts: 9792
Joined: 19 Dec 2005, 04:14

by Corsair1963 » 15 Sep 2020, 05:54

Actually, the USN should be acquiring enough F-35C's to stand up two squadrons per year now. (i.e. 10 aircraft) So, makes you wonder. If, some cut backs in orders are coming???


Elite 1K
Elite 1K
 
Posts: 1496
Joined: 14 Mar 2012, 06:46

by marauder2048 » 20 Sep 2020, 20:00

Corsair1963 wrote:
gc wrote:16 F-35C for the future Carrier Air Wing. Less Rhinos featured.

https://seapowermagazine.org/navys-futu ... nto-focus/


Sounds like the USN is pushing the first of F-35C Squadrons to 16 instead of 10. Until every Air Wing acquires at least a single Squadron. I assume that number will drop back to 10 -12 aircraft. When they add a second squadron to each Air Wing post 2030.



The slide from Tailhook 2020.
Attachments
Screen Shot 2020-09-20 at 12.43.47 AM.png


Elite 5K
Elite 5K
 
Posts: 5184
Joined: 13 Mar 2013, 08:31
Location: Finland

by hornetfinn » 21 Sep 2020, 12:04

marauder2048 wrote:The slide from Tailhook 2020.


Interesting, thanks you. I find it a bit strange that the F-35 SATCOM and DAS system have been omitted in this slide. Also interesting that JSOW is missing from weapons list. Maybe these are just unintentional omissions?


Elite 1K
Elite 1K
 
Posts: 1496
Joined: 14 Mar 2012, 06:46

by marauder2048 » 22 Sep 2020, 07:07

hornetfinn wrote:
marauder2048 wrote:The slide from Tailhook 2020.

Also interesting that JSOW is missing from weapons list.


Yeah. I noticed that too..but they have JASSM-ER (?!) which, AFAIK, the Navy has not committed to buying.


Elite 5K
Elite 5K
 
Posts: 9792
Joined: 19 Dec 2005, 04:14

by Corsair1963 » 03 Nov 2020, 04:11

Navy Shifts Future Carrier JFK to Single-Phase Delivery With F-35C Modifications Included


The Navy today issued a contract modification to move its next Ford-class aircraft carrier to a more traditional single-phase delivery, with the intention of getting the future John F. Kennedy (CVN-79) in deployable shape on a faster timeline.

JFK was previously slated to go through a two-phase delivery process, where the ship would be mostly completed and then the workforce at Newport News Shipbuilding would pause and install electronics and other modifications at a later time. This plan was unveiled in the Fiscal Year 2016 budget as a means of building the carrier on the most cost-effective schedule for the workforce at the construction yard but avoiding an overlap of JFK and USS Nimitz (CVN-68) in the fleet, which would put a strain on Navy budgets and personnel to operate both. By inserting a gap in construction and delaying final delivery, the ship would receive the most up-to-date technology just ahead of its entry to the fleet, once the fleet was ready to induct a new carrier.

However, that decision was made when JFK was expected to deliver in 2022 and the overlap between Kennedy and Nimitz would have been longer. The Navy is now eyeing a 2024 delivery for JFK regardless of whether it delivers fully outfitted or not.

The Navy today awarded Newport News Shipbuilding two contract modifications valued at up to $315 million combined to convert to a single-phase delivery and to install F-35C Lightning II Joint Strike Fighter modifications ahead of delivery.

“The Navy is transitioning to a single-phase delivery approach to meet both Fleet requirements and a congressional mandate of ensuring that CVN 79 is capable of operating and deploying Joint Strike Fighter (F-35C) aircraft before completing the post-shakedown availability as codified in Section 124 of the fiscal 2020 National Defense Authorization Act (Public Law 116-92),” reads the contract announcement.
“The single-phase delivery date is planned for June 30, 2024.”

“The contract action announced today revises the two-phased delivery approach originally planned for the second ship in the Gerald R. Ford-class of carriers. It comes as a result of extensive collaboration with the Navy to support legislative requirements for Kennedy to be delivered with its complete warfare system, including F-35 Joint Strike Fighter capabilities, before the ship is commissioned into the fleet,” reads a news release from Newport News Shipbuilding.

“We are pleased to have worked with the Navy to adopt lessons learned in the construction of USS Gerald R. Ford (CVN 78) to improve cost, production and planning efficiencies on Kennedy,” Lucas Hicks, Newport News’ vice president of new construction aircraft carrier programs, said in the news release.
“We believe that the single-phase approach ensures the most effective build plan for all remaining work and provides the best value for the Navy by supporting its ability to accelerate operational deployment of this maritime force asset.”

Navy acquisition chief James Geurts “has been driving a single-phase delivery strategy for JFK that included F-35C capabilities to achieve the most efficient path to delivery as compared to the baseline two-phased delivery” plan the Navy had previously planned, Navy spokesman Capt. Danny Hernandez told USNI News.
“He feels single-phase will deliver a more capable and lethal ship to the fleet.”

This new plan, he said, will deliver a more capable ship to the fleet and hasten its ability to get trained up and out on deployment. If the F-35 modifications were done during the ship’s post-shakedown availability, that maintenance period could run longer and could delay the ship from starting workups for its maiden deployment.

The new plan represents “no impact to JFK’s baseline delivery date in 2024,” but at the time of delivery the ship will be complete and will be F-35C-compatible. According to FY 2016 budget documents, the ship would have had its initial acceptance in 2022 and then final delivery in 2024. This new conversion to a single-phase delivery maintains the 2024 delivery timeline.

Lawmakers in June 2019 were angered when they were told that the Ford-class carriers would be built and delivered without the ability to support the F-35C. In the FY 2020 National Defense Authorization Act they required that JFK be made F-35-compatible by the time it completes its post-shakedown availability following its final tests and trials.

At the time, Hernandez told USNI News that “the Nimitz-class and Ford-class aircraft carriers, by design, can operate with F-35Cs; however, there are modifications to both carrier classes that are required in order to fully employ the capabilities of the F-35s and enable them to be more effective on a full-length deployment. … These F-35C modifications for CVN-78 and CVN-79 are currently scheduled for a future post-delivery modernization maintenance period that will occur prior to the planned F-35C operations on those carriers. This has always been the plan for CVN-78 and CVN-79 over several budget cycles. CVN-80 and CVN-81 will be constructed with those modifications made during construction and will not require a post-delivery modification.”

Now, rather than waiting until post-delivery maintenance availabilities, Kennedy will undergo the F-35 modifications during construction and will be delivered to the Navy with the computer systems that support F-35 logistics and sustainment, data collection and more.

According to Newport News Shipbuilding, Kennedy is approximately 76 percent complete. The ship was launched in December 2019 and is undergoing further outfitting and testing.




https://news.usni.org/2020/11/02/navy-s ... more-81182


User avatar
Elite 5K
Elite 5K
 
Posts: 28404
Joined: 05 May 2009, 21:31
Location: Australia

by spazsinbad » 05 Nov 2020, 00:58



User avatar
Elite 1K
Elite 1K
 
Posts: 1870
Joined: 31 Dec 2015, 05:35
Location: Australia

by element1loop » 05 Nov 2020, 01:36

MQ-25A equipping will need to be done in one step also from here.
Accel + Alt + VLO + DAS + MDF + Radial Distance = LIFE . . . Always choose Stealth


Elite 1K
Elite 1K
 
Posts: 1452
Joined: 16 Mar 2020, 02:09

by jessmo112 » 28 Jan 2021, 00:09

F-35C almost splashes in the ocean.

https://www.businessinsider.com/f35-nea ... 2020-5?amp

My hats off to anyone who has every shot themselves off a ship, or who ever will.


User avatar
Elite 5K
Elite 5K
 
Posts: 28404
Joined: 05 May 2009, 21:31
Location: Australia

by spazsinbad » 28 Jan 2021, 01:00

These minimum end speed catapult shots are carefully calculated within limits (explanation elsewhere in forum). The carrier is moving up and down a little which exacerbates the 'drop'. The deck is some 60 feet ASL? (I'll have to check) For sure test pilots take calculated risks. There is a video of the first night F-35C catapult when the pilot being uncertain lights burner.

F-35C Test Catapult Min End Speed Deliberate No Burner https://www.youtube.com/watch?v=O69o8UFCEOw



Elite 5K
Elite 5K
 
Posts: 5319
Joined: 20 Mar 2010, 10:26
Location: Parts Unknown

by mixelflick » 28 Jan 2021, 15:47

Well, I think this move with the Kennedy and upping the number of F-35C's is (finally) a sign the Navy is getting behind the program. For too long, they've given the impression they'd just take a big toe in the water approach, vs. believing in the thing from the get go. That's the impression I got anyway, whenever it came to the Navy and F-35. Yes, I understand its more expensive (right now) vs. the SH, but not by much!

It's as if you have to wean them off their SH/Growler fix, which might not be far from the truth. After 15 years of nothing but Hornets, the sight of a new aiframe probably caused much consternation. The F-35C will only compliment it though,not function as a 1 for 1 replacement. I'm not sure even NGAD's arrival will result in that.

Hornets will be flying from decks for a long time...


Previous

Who is online
Users browsing this forum: No registered users and 2 guests