popcorn, I don't have a subscription either however someone has posted this tidbit:
“
DOD, Lockheed Agree On Redesign Of JSF Drive Shaft Critical To Marine Corps Plans
http://defense.iwpnewsstand.com/insider ... e=06242010
"The Defense Department and Lockheed Martin have agreed to a new design of a component critical to the Marine Corps’ variant of the Joint Strike Fighter — a drive shaft connecting the main engine to the vertical lift fan that will be incorporated into the F-35B
if test flights in the coming months validate recent durability concerns.
On June 10, plans for a new drive shaft passed muster with government and contractor officials conducting a critical design review. They gave the green light to proceed with the production of the new component, which
if necessary may be incorporated into Joint Strike Fighter aircraft built under the next production batch -- low rate initial production lot 4, according to a Lockheed official.
“Delivery of the first redesigned drive shaft for testing is scheduled for late 2010,” John Kent, a spokesman for Lockheed Martin, said in a written response to questions from InsideDefense.com.”
To me
IF is a
BIG word.

Here is the link again:
http://defense.iwpnewsstand.com/insider ... e=06242010
A4G Skyhawk: www.faaaa.asn.au/spazsinbad-a4g/ & www.youtube.com/channel/UCwqC_s6gcCVvG7NOge3qfAQ/videos?view_as=subscriber