jessmo111 wrote:@ will the USN, USAF, and marines adopt brimestone?
They can if they want to.
Fast jet JAGM is not out of the picture yet.
After enough JCM/JAGM missile program cancellations and resurrections to make even Lazarus give up, the US Army looked at its Hellfire stocks, and realized that they’d need something new anyway. In response, they decided to try squaring this circle using an incremental approach, one focused on replacing the most at-risk AGM-114L radar-guided missiles first.
Initial. The JAGM Continued Technology Development phase now aims to create dual-mode laser/radar guidance sections that can equip existing Hellfire II missiles. Essentially, JAGM Increment 1 would create a Hellfire III missile with dual-mode guidance, matched to the AGM-114R’s multi-role warhead and rocket. Initial Army platforms would include the AH-64E Apache attack helicopter, and MQ-1C Gray Eagle UAV. The USMC’s initial platforms will be the AH-1Z Viper attack helicopter and KC-130J Harvest Hawk armed tanker/ transport, for integration by FY 2019.
JAGM Increment 2. Intends to increase the maximum range to 12 km, and move to the full tri-mode seeker with semi-active laser, Imaging Infrared (IIR), and millimeter wave radar guidance modes. If Raytheon bids, they’d be offering the tri-mode seeker in Increment 1 as well.
JAGM Increment 3. This is the original JAGM concept, more or less. It would have a maximum range of 16 km that would likely force a new rocket motor, alongside other redesigns for carriage and launch from helicopters or fast jets. Initial fixed-wing platforms would include the USMC’s AV-8B Harrier and B Lightning II STOVL fighters, but there’s no set schedule. The earliest integration slot involves Block 4 fighters, whose software isn’t likely to be ready before 2021-2023.
http://www.defenseindustrydaily.com/joi ... tten-0229/The split up of JAGM into 3 increments has been in the works for quite a while. I've seen congressional testemony dated April 2014 talking about it.
Here is another overview of the original JAGM requirement and how the Increments are laid out. Sorry, no timeline on Inc2&3.
