uclass wrote:bigjku wrote:http://www.janes.com/article/53302/typhoon-p2e-upgrade-trials-to-begin-shortly
According to this update which is about as detailed and current as I have seen the situation is roughly as follows. They are just starting flight testing in Meteor and Storn Shadow capability which all partners are committed to. The UK is committed to the next upgrade which basically gets them Brimstone. No one else seems interested in that.
The AESA has not flown yet. They hope it flys later this year in a developmental model. No one has publicly committed to putting it out operationally yet. They don't even know what issues they might hit when it goes in the air. If the Saudis are flying with an AESA I would love to know what radar it is and who makes it. Most likely they were referencing that the aircraft could be fitted with it like all the tranche 2 and 3 aircraft are supposed to be capable of. At the end of 2014 first flight was supposed to be early 2015. Now they hope it is in 2015.
There is probably a bit of a learning curve here as well. Does anyone really think they will just slap this thing in and have full integration from day 1? There are probably years of work to do on this thing to get all the air to air and air to ground modes functioning properly. When I see a contract to actually build a deployed radar I will believe it, not before then. The Germans appear to have not interest in moving forward on most defense matters really.
They aren't flying with it yet but the export version is going on the batch of 24 RSAF aircraft currently being built. Integration began last year. Flight testing is part of that integration.
The learning curve isn't that big at all. The biggest problem with the integration of any electronic system is making sure it's actually been fitted correctly. The actual functional part of the integration test is done at the factory. They don't just design a standalone radar on a bench without testing it in conjunction with the system it's being fitted to. Usually there will exist what's called an iron bird model, which is basically just wires and electronics systems from the aircraft in a room in a building somewhere. Normally it will also have been flown on a test mule of some guise too. What remains in terms of putting it on an IPA is actually better described as commissioning in more traditional engineering terms. It's actually inaccurate to call it integration, since the integration testing has already happened. There's no way it would even being going on a plane if systems integration testing hadn't already occurred. It's likely waiting to be commissioned alongside Meteor, which would make sense if you think about it.
The UK is funding it, so German lethargy is no longer an issue.
https://www.rusi.org/analysis/commentar ... cMuhPlVhLM
Are there any sources that show this is actually going on as scheduled though? I provided the janes update which is a year more current than this one and it explicitly describes the situation with the CAPTOR-e being part of P4e rather than P3e. Seeing as P2e is scheduled to be ready by sometime in 2017 and P3e is supposed to be sometime in 2018 that would put this out to at least 2019 I would think.
I am not disputing what you say but do you really think an operational AESA will be flying with Eurofighter before 2019? Nothing I have read indicates much certainty with the issue at all. I guess I just expected to see something beyond a development contract signed at this point if deployment really is right around the corner.