Forum: Program and politics

IG looking at the F-35 program



Search Search  Register Register  Private Messages Private Messages
guidelines Forum Guidelines
Post new topic   Reply to topic   
View previous topic Log in to check your private messages View next topic
Author Message
maus92
PostPosted: Mar 03, 2012 - 03:59 AM Reply with quote Back to top
Elite 1K
Elite 1K


Joined: May 21, 2010 - 06:50 PM
Posts: 1209
Location: Annapolis, MD
Status: Offline
Not unexpected.

http://battleland.blogs.time.com/2012/0 ... 5-program/
 View user's profile Send private message  
 
Sponsor
New postPosted: Jun 19, 2013 - 4:01 AM Back to top
F-16.net Sponsor





  Send private message  
 
spazsinbad
PostPosted: Mar 03, 2012 - 10:19 AM Reply with quote Back to top
Elite 3K
Elite 3K


Joined: May 05, 2009 - 10:31 PM
Posts: 8022
Location: OZ
Why so coy about content? Storm in a teacup until otherwise proven I reckon as seen from words on the linked article above:

"The Department of Defense Inspector General’s March newsletter contains this nugget:

Joint Strike Fighter (F-35) Quality Assurance Assessment. The objective of this assessment is to assess the quality management system for the Joint Strike Fighter procured by DoD from Lockheed Martin Corporation. The assessments will be performed on-site at Lockheed Martin, Northrop Grumman, BAE, and various sub-contractor facilities. Specifically, the assessment will focus on conformity to specified quality management system(s), contractual quality clauses, and internal quality processes and procedures.

Typically it’s been my experience that the IG won’t embark on projects willy-nilly. The latest annual Pentagon test and evaluation report noted high failure rates of some of the parts on the F-35B variant, although many of the fixes to the problems are redesigns, so the problems themselves may not be due to a lack of quality assurance. It’s possible this assessment is a move by the IG to the engage in preventative oversight of the $380 billion program to help keep it on track, rather than in reaction to something it has discovered...."

_________________
RAN FAA A4G: http://tinyurl.com/ctfwb3t http://tinyurl.com/ccmlenr http://www.youtube.com/user/bengello/videos
 View user's profile Send private message Visit poster's website  
 
maus92
PostPosted: Mar 05, 2012 - 05:10 PM Reply with quote Back to top
Elite 1K
Elite 1K


Joined: May 21, 2010 - 06:50 PM
Posts: 1209
Location: Annapolis, MD
Status: Offline
"“The objective is to assess” the program’s quality management at Lockheed Martin’s Fort Worth, Texas, facility and those of subcontractors Northrop Grumman Corp. (NOC) and BAE Systems Plc (BA/), the inspector general said in a summary included in its March activities newsletter posted online.

“The assessment will focus on conformity to specified quality management systems, contractual quality clauses and internal processes and procedures,” according to the summary issued by Acting Inspector General Lynne Halbrooks."


http://www.bloomberg.com/news/2012-03-0 ... ector.html
 View user's profile Send private message  
 
Display posts from previous:     
Jump to:  
All times are GMT + 1 Hour
Post new topic   Reply to topic
View previous topic Log in to check your private messages View next topic