Forum: Modern Military Aircraft

Golden Eagle question?



Search Search  Register Register  Private Messages Private Messages
guidelines Forum Guidelines
Post new topic   Reply to topic   Previous  1, 2
View previous topic Log in to check your private messages View next topic
Author Message
SpudmanWP
PostPosted: Apr 01, 2010 - 09:59 PM Reply with quote Back to top
Elite 3K
Elite 3K


Joined: Oct 12, 2006 - 08:18 PM
Posts: 4279
Location: California
Status: Online!
There have been 61 APG-63(v)3 kits already paid for (through FY2011). With the stoppage of the F-22 and the delay in F-35s, I doubt that they will reduce the orders.

On the IRST, it will likely be a new or highly modified design, although it will likely look similar from the outside. If it were the same as the F-15K's IRST, it could be installed without much integration work. However, looking at the FY2011 FY2011 RDT&E doc for the F-15 (page 17) shows that development will start in 2010 and last for more than 4 years.



dff90019.jpg
 Description:
 Filesize:  109.24 KB
 Viewed:  2177 Time(s)

dff90019.jpg



unclassified-0207134F_PB_2011.pdf
 Description:
FY2011 RDT&E doc for the F-15

Download
 Filename:  unclassified-0207134F_PB_2011.pdf
 Filesize:  1.97 MB
 Downloaded:  141 Time(s)

 View user's profile Send private message  
 
Sponsor
New postPosted: May 26, 2013 - 4:20 AM Back to top
F-16.net Sponsor





  Send private message  
 
Meathook
PostPosted: Apr 02, 2010 - 03:40 AM Reply with quote Back to top
Elite 3K
Elite 3K


Joined: May 14, 2004 - 12:37 AM
Posts: 3321

Status: Offline
Spud - interesting information, I cant get that page to open up (something with my computer at home I am sure) but what is the Distro statement of that report (http://www.dtic.mil/descriptivesum/Y2011/AirForce/0207134F_PB_2011.pdf) - thanks,,,I will have to try it at work and see if it opens there

_________________
More than likely have "been there and done that at some point", it sure keeps you young if done correctly
 View user's profile Send private message  
 
geogen
PostPosted: Apr 02, 2010 - 11:03 AM Reply with quote Back to top
Elite 2K
Elite 2K


Joined: Mar 11, 2008 - 03:28 PM
Posts: 2804
Location: 45 km offshore, New England
Status: Offline
Thanks for follow-up IRST info, Spud. So that looks like FY16 install? For some reason I was going w/ an interim IRST integration, for either USAF's C/D or E, perhaps similar to the -15SG pod. I don't know if I read that somewhere or had that mis-impression. It would seem sensible in the interim anyway. Although, I'm surprised an Eagle centerline line IRST-tank wasn't designed along with the Super Hornet IRST tank (if it were feasible). It would seem that it might be of tactical interest, as a bolt-on 'multiplier' among world operators, I don't know.

But staying the course 'procurement and program wise', I guess I would remain skeptical that USAF would actually be operating (due to raw budget implications) more than 75 C/D Golden Eagles beyond 2020. I'm just convinced something would have to give in the current procurement scheme in order to maintain a larger force for an extended term. (admittedly a bit pessimistic there, all things being constant).

_________________
The Super-Viper has not yet begun to concede.
 View user's profile Send private message Visit poster's website  
 
Meathook
PostPosted: Apr 02, 2010 - 08:12 PM Reply with quote Back to top
Elite 3K
Elite 3K


Joined: May 14, 2004 - 12:37 AM
Posts: 3321

Status: Offline
I got the entire report now - thanks

_________________
More than likely have "been there and done that at some point", it sure keeps you young if done correctly
 View user's profile Send private message  
 
Display posts from previous:     
Jump to:  
All times are GMT + 1 Hour
Post new topic   Reply to topic
View previous topic Log in to check your private messages View next topic