| Author |
Message |
|
spazsinbad
|
Posted: Apr 18, 2012 - 04:34 AM
|
|
|
Elite 3K

Joined: May 05, 2009 - 10:31 PM
Posts: 7874
Location: OZ
|
FWIW (I cannot hear sound) here is the UK Opposition Shadow DefMin on VIDEO:
Shadow Defence Secretary's take on F35-B 17 April 2012
http://www.bfbs.com/news/uk/shadow-defe ... 56561.html
"Forces News has been speaking to Shadow Defence Secretary Jim Murphy about an imminent Government decision that could see Britain's new aircraft carriers carry a fleet of jump jets.
He says the F35-B - the Joint Strike Fighter version originally ordered by the previous Labour Government and now favoured by military chiefs - should never have been shelved by the coalition, which chose the F35-C cat and trap version after completing its Strategic Defence and Security Review.
But spiraling costs, including the billions of pounds of adaptations needed to the new aircraft carriers, have cast the wisdom of that decision into doubt. Now Downing Street sources have suggested the F35-C is about to be scrapped, throwing plans for "cross-decking" between the French and British naval fleets into doubt."
VIDEO may be downloaded: http://www.bfbs.com/news/sites/ssvc.com ... hy_i_v.mp4 (28Mb) |
_________________ RAN FAA A4G: http://tinyurl.com/ctfwb3t http://tinyurl.com/ccmlenr http://www.youtube.com/user/bengello/videos
|
|
|
|
 |
|
Sponsor
|
Posted: May 24, 2013 - 7:14 PM
|
|
|
F-16.net Sponsor
|
|
|
|
 |
|
delvo
|
Posted: Apr 18, 2012 - 10:45 AM
|
|
|
Senior member

Joined: Aug 15, 2011 - 05:06 AM
Posts: 409
Status: Offline
|
This is unfortunate for their overall military force, with the lower range & weight, but if switching to C was really expensive, then it was really expensive.
I still don't get, though, why they can't stick with B for the carriers they've already got and just build the next carrier(s) for C. You'd still get at least one carrier that can handle the longer-range and heavier-payload plane instead of zero, you'd still get to skip the costs of altering the old carriers, and the similarity of the two kinds of plane would mean you only had to maintain the support system (such as training & supplies) for essentially one kind of plane instead of two. |
|
|
|
|
|
 |
|
spazsinbad
|
Posted: Apr 18, 2012 - 11:05 AM
|
|
|
Elite 3K

Joined: May 05, 2009 - 10:31 PM
Posts: 7874
Location: OZ
|
|
|
|
 |
|
lb
|
Posted: Apr 18, 2012 - 11:55 AM
|
|
|
Active Member

Joined: Feb 02, 2010 - 04:30 AM
Posts: 241
Location: USA
Status: Offline
|
It's in fact rather stunning they didn't cost out the conversion when they made the original choice to switch to the C. Moreover, that decision contained a lot of wording regarding saving money which was never explained in detail and was in fact obviously wrong. It entirely seemed like smoke and mirrors in that the real savings was made by only operating one carrier and cutting the aircraft buy by more than half. So now the RN is left with one large CV operating a dozen B's most of the time. Frankly they were better off with 3 small carriers and thus always having one with 12 fighters available with a 2nd when required.
As a very long time admirer of the RN it's rather sad seeing the state they're in now. The writing was on the wall when the Sea Harriers were retired early, the Type 22 batch 3's were retired without replacement, etc. In 1990 the RN had 49 escorts, 3 small carriers, and 29 SSN and SSK's. Today they're down to 18 escorts, no carriers, and 7 SSN's. Not to mention the Nimrod's were also retired without replacement. |
|
|
|
|
|
 |
|
stobiewan
|
Posted: Apr 18, 2012 - 12:22 PM
|
|
|
Active Member

Joined: Jan 14, 2010 - 12:34 PM
Posts: 174
Location: UK
Status: Offline
|
|
spazsinbad wrote:
The cost to alter the 2nd CVF was prohibitive - let alone altering the 1st CVF, which apparently has already had the ski jump removed which I guess will be put back. This is relatively easy it is said. We will have to wait until more official details announced in a week or so. But it ain't over 'til it is over.
The ski jump is a bolt on assembly which would go on last, once all the blocks have been joined - we're a way from that - construction of the ski jump might have been delayed or put off but it's certainly *not* been fitted, then removed. |
|
|
|
|
|
 |
|
bjr1028
|
Posted: Apr 18, 2012 - 04:47 PM
|
|
|
Forum Veteran

Joined: Jul 07, 2009 - 04:34 AM
Posts: 503
Location: Dubuque, IA
Status: Offline
|
|
SpudmanWP wrote:
So, in other words, they now have the World's largest LPH if the F-35B gets the axe or has become too heavy to be effective. |
|
|
|
|
|
 |
|
spazsinbad
|
Posted: Apr 18, 2012 - 04:50 PM
|
|
|
Elite 3K

Joined: May 05, 2009 - 10:31 PM
Posts: 7874
Location: OZ
|
|
|
|
 |
|
emc2
|
Posted: Apr 18, 2012 - 05:00 PM
|
|
|
Newbie

Joined: Apr 11, 2012 - 01:55 PM
Posts: 9
Status: Offline
|
|
stobiewan wrote:
spazsinbad wrote:
The cost to alter the 2nd CVF was prohibitive - let alone altering the 1st CVF, which apparently has already had the ski jump removed which I guess will be put back. This is relatively easy it is said. We will have to wait until more official details announced in a week or so. But it ain't over 'til it is over.
The ski jump is a bolt on assembly which would go on last, once all the blocks have been joined - we're a way from that - construction of the ski jump might have been delayed or put off but it's certainly *not* been fitted, then removed.
The first ship - HMS Queen Elizabeth - has never been considered for CATOBAR conversion.
The second was only started in May 2011, so the faffing about shouldn't have made any real difference |
|
|
|
|
|
 |
|
spazsinbad
|
Posted: Apr 18, 2012 - 05:11 PM
|
|
|
Elite 3K

Joined: May 05, 2009 - 10:31 PM
Posts: 7874
Location: OZ
|
|
|
|
 |
|
SpudmanWP
|
Posted: Apr 18, 2012 - 05:21 PM
|
|
|
Elite 3K

Joined: Oct 12, 2006 - 08:18 PM
Posts: 4275
Location: California
Status: Offline
|
| It looks like the U-Turn will come just in time so as to not waste time & money putting the ramp back on. |
_________________ "The early bird gets the worm but the second mouse gets the cheese."
|
|
|
|
 |
|
emc2
|
Posted: Apr 18, 2012 - 05:40 PM
|
|
|
Newbie

Joined: Apr 11, 2012 - 01:55 PM
Posts: 9
Status: Offline
|
|
spazsinbad wrote:
Report about CVF 'ski jump removal' on page 21 of this thread:
So it hasn't been removed. |
|
|
|
|
|
 |
|
spazsinbad
|
Posted: Apr 18, 2012 - 11:36 PM
|
|
|
Elite 3K

Joined: May 05, 2009 - 10:31 PM
Posts: 7874
Location: OZ
|
|
|
|
 |
|
stobiewan
|
Posted: Apr 19, 2012 - 12:33 AM
|
|
|
Active Member

Joined: Jan 14, 2010 - 12:34 PM
Posts: 174
Location: UK
Status: Offline
|
|
|
|
 |
|
spazsinbad
|
Posted: Apr 19, 2012 - 12:39 AM
|
|
|
Elite 3K

Joined: May 05, 2009 - 10:31 PM
Posts: 7874
Location: OZ
|
|
|
|
 |
|
stobiewan
|
Posted: Apr 19, 2012 - 12:39 AM
|
|
|
Active Member

Joined: Jan 14, 2010 - 12:34 PM
Posts: 174
Location: UK
Status: Offline
|
|
emc2 wrote:
stobiewan wrote:
spazsinbad wrote:
The cost to alter the 2nd CVF was prohibitive - let alone altering the 1st CVF, which apparently has already had the ski jump removed which I guess will be put back. This is relatively easy it is said. We will have to wait until more official details announced in a week or so. But it ain't over 'til it is over.
The ski jump is a bolt on assembly which would go on last, once all the blocks have been joined - we're a way from that - construction of the ski jump might have been delayed or put off but it's certainly *not* been fitted, then removed.
The first ship - HMS Queen Elizabeth - has never been considered for CATOBAR conversion.
The second was only started in May 2011, so the faffing about shouldn't have made any real difference
Technically, no official announcement has been made about which carrier would get cats and traps, but everyone's assumed that the POW is the logical candidate, given that the delivery of EMALS wouldn't happen until after the QE had been floated out.
However, it's been assumed that the QE would be run as an LPH with no STOVL ops so the ramp would be superfluous and as far as I understand, there was never any intention to fit a ski jump to either ship if the CATOBAR option were followed.
That's how I understood it five minutes ago, it's probably been revised twice since then. :sigh:
Wish they'd just build the frickin' things already...Nghh... |
|
|
|
|
|
 |
|
|