LM receives $2.2 billion for F-35 Lot 2 production



Search Search  Register Register  Log in to check your private messages Log in to check your private messages
guidelines Forum Guidelines
Post new topic   Reply to topic   
View previous topic Log in to check your private messages View next topic
Author Message
J.J.
PostPosted: May 24, 2008 - 06:55 PM Reply with quote Back to top
Elite 2K
Elite 2K


Joined: Oct 20, 2005
Posts: 2097

Status: Offline
Lockheed Martin in a press release wrote:

LOCKHEED MARTIN RECEIVES $2.2 BILLION FOR F-35 LOT 2 PRODUCTION, $197 MILLION FOR LOT 3 LONG-LEAD FUNDING

FORT WORTH, Texas, May 22nd, 2008 -- The United States Department of Defense has authorized the release of funds to buy six conventional takeoff and landing (CTOL) F-35A Lightning IIs for the U.S. Air Force, with provisional approval to purchase six short takeoff/vertical landing (STOVL) F-35Bs for the U.S. Marine Corps following a senior leadership review and the inaugural flight of that variant. The 12 aircraft will be built in the second phase of F-35 low-rate initial production (LRIP 2).

The $2.2 billion contract authorization comes after the Defense Acquisition Boardīs recommendation to release the funds and proceed with production. "We welcome the boardīs decision and their vote of confidence in the F-35 program," said Dan Crowley, Lockheed Martin executive vice president and F-35 program general manager. "Weīre seeing excellent progress on our production line, with 17 preproduction aircraft in assembly flow, the first two production-model F-35s already under way and unprecedented assembly quality across the board."

Long-lead funds of $197 million for LRIP 3 were released on May 14 for at least 18 additional F-35s. The LRIP I contract for the first two F-35A production aircraft was finalized and issued in July 2007.

The first F-35A test aircraft has completed 40 flights and has exceeded performance and reliability expectations. The inaugural flight of the first F-35B is on schedule for late spring/early summer.

The F-35 is a supersonic, multi-role, 5th generation stealth fighter. Three F-35 variants derived from a common design, developed together and using the same sustainment infrastructure worldwide will replace at least 13 types of aircraft for 11 nations initially, making the Lightning II the most economical fighter program in history.

Lockheed Martin is developing the F-35 with its principal industrial partners, Northrop Grumman and BAE Systems. Two separate, interchangeable F-35 engines are under development: the Pratt & Whitney F135 and the GE Rolls-Royce Fighter Engine Team F136.

Headquartered in Bethesda, Md., Lockheed Martin employs about 140,000 people worldwide and is principally engaged in the research, design, development, manufacture, integration and sustainment of advanced technology systems, products and services. The Corporation reported 2007 sales of $41.9 billion.

Source: http://www.lockheedmartin.com/news/pres ... dod12.html


Hope thatīs of interest (because I seldom watch our F-35 Forum).
 View user's profile Send private message  
 
Sponsor
New postPosted: Oct 13, 2008 - 5:06 PM Back to top
F-16.net Sponsor






This message from our sponsor will disappear if you log on as a member.
   
 
MechFromHell
PostPosted: May 26, 2008 - 02:33 AM Reply with quote Back to top
Senior member
Senior member


Joined: Sep 22, 2005
Posts: 300

Status: Offline
Does anyone know a better time frame than "late spring or early summer" for the B model's first flight?

_________________
Crew Chief
Mountain Home AFB 2000-2005 ~ Acft 91-0370
Sheppard AFB 2005- NOW
www.myspace.com/mechfromhell
 View user's profile Send private message  
 
geogen
PostPosted: May 26, 2008 - 02:36 AM Reply with quote Back to top
Senior member
Senior member


Joined: Mar 11, 2008
Posts: 433

Status: Offline
I deleted my original post since I have since found some info satisfying my question. But I'm curious about something about LRIP II and III... GAO report stated something about final F-35 software block anticipated to be complete and rdy for install by 2011? So will these two said LRIPs be delivered without this final block completion or will the aircraft delivery be held until the software is installed as a last process in the manufacture? Or am I misunderstanding the GAO statement regarding the estimated 2011 software date in question? Thanks for any insights..

_________________
The Super-Viper has not yet begun to concede.


Last edited by geogen on May 26, 2008 - 07:10 AM; edited 1 time in total
 View user's profile Send private message  
 
dwightlooi
PostPosted: May 26, 2008 - 06:45 AM Reply with quote Back to top
Forum Veteran
Forum Veteran


Joined: Aug 01, 2006
Posts: 958

Status: Offline
MechFromHell wrote:
Does anyone know a better time frame than "late spring or early summer" for the B model's first flight?


F-35 BF-1 has just received flight certification. So in essence it can fly any day now.
 View user's profile Send private message  
 
Display posts from previous:     
Jump to:  
All times are GMT + 1 Hour
Post new topic   Reply to topic
View previous topic Log in to check your private messages View next topic
Copyright © 2008 Lieven Dewitte and Stefaan Vanhastel